BOMBARDIER LEAR 60-131 S/N #0131

Airframe

  • Total Time: 5074.30 hours
  • Total Landings: 4396

Engine Status

  • PW305A: SN: PCE-CA0097 / PCI-CA0098
    Total Time: 5074.30 / 5087.80
    Total Cycles: 4386 / 4396

Programs

  • Engines Enrolled in Pratt & Whitney ESP Gold Program

Avionics

  • Collins Pro Line 4 - 4 Tube EFIS
  • Dual Collins ADC-850D Air Data Computers
  • Dual Collins AHS-85 AHRS
  • Dual Collins FCS-850A IFCS
  • Dual Collins VHF-422A Comm Radios
  • Dual Collins VIR-432 Nav Radios
  • Dual CollinsRTU-870 Radio Tuning Units
  • Dual Collins ADF-462 ADF
  • Dual Collins DME-442 DME
  • Dual Collins ALT-55B Radio Altimeters
  • Dual Collins TDR-94D-501 with ADS-B out transponders
  • Dual Universal UNS-1EW FMS WAAS/LPV
  • Universal CVR-30B Cockpit Voice Recorder
  • Collins TWR-850 Weather Radar
  • Electronic Standby Instruments (3 in 1)
  • RVSM - 8.33 Spacing - FM Immunity, RNP, & RNAV
  • Collins TTR-920 TCAS-II w/Change 7
  • Single King KHF-950 HF Radios w/SELCAL
  • Dual M877 Clocks
  • Allied Signal Mark V EGPWS Class A TAWS

Additional Equipment

  • WAAS/LPV ADSB
  • Airshow 400
  • 115 Volt Power Supply in Cabin
  • Warming Oven
  • Heated Liquid Dispensers
  • Real Wood Veneer
  • Belted Lavatory
  • Forward and Aft Bulkhead Flat Screen Monitors

Exterior

  • New Metallic Paint in 2013 by Westar Aviation, Grand Junction, CO

Interior

  • New Interior in 2013 by Westar Aviation, Grand Junction, CO
  • Floor Plan 2 with 8 Passenger Fire blocked interior with Forward RD 2 Place Side Facing Divan, Opposite LH Forward Facing Singel Seat, Aft 4 Place Club, 16 G Belted Private Aft Lavatory, Light Beige and Fawn Interior Colors, Pyramid Cabinets, Forward Full Length Closet, Forward Galley with Warming Oven.

APU

  • Model: T-20G-10-C3A: Serial No.: 868701
  • Total Time: 2556 Hours: Total Cycles: 3006

Maintenance

  • Fresh A Inspection: December 2019
  • Fresh Brake Overhaul: December 2019
  • Fresh RH Inlet: December 2019
  • Phase A, B, and C Inspections c/w by Florida Jet FXE, Florida, December 7, 2018: 3,000 Landings Inspection c/w (2,918 LDGS) on July 2011 (Bombardier Dallas)
  • 12-Year Inspection c/w in July 2011 (Bombardier Dallas): Maintenance Tracking on CAMP